Plans are under way to rebuild one of Ontario Power Generation’s oldest hydroelectric generating stations, which was damaged by a tornado in 2018. Constructed in 1917, the 5-MW Calabogie Generating Station has produced renewable, low-cost electricity on the Madawaska River for decades.